THE RIVERFRONT TRAIL INITIATIVE

The need for a trail along the Kankakee River was first introduced in the Kankakee County Greenways and Trails Plan adopted June 8, 1999 by the Kankakee County Board. In that plan the areas along the Kankakee River are linked together through a series of trails that interconnect the parks along the river from the south County Line with Iroquois County to the western County Line shared by Will County within the Kankakee River State Park. This initiative elaborates upon the 1999 plan.
pic
 
In 2003 - 2004, the new George H. and Lura Lynn Ryan Family Aquatic Center was built south of River Road Park near the Kankakee River and plans are being formed to construct an Ice Arena and Fitness Center near the boundaries of Kankakee Community College’s property in the near future. These two improvement projects prompted an effort by officials at the College to reopen discussion about the need for a trail along the river in that area to transport children from the City’s residential neighborhoods to the Park Districts new attractions some 2 miles away. Without an adequate trail children wishing to use these facilities would have to travel down dangerous and narrow highways. These highways are heavily traveled by automobiles and large trucks and have speed limits up to 45 miles per hour. It was felt that a safer alternative could be found. Phase I of the Riverfront Trail focuses on alleviating these problems.
 
pic
During the discussions about the trail for the Aquatic Center it was suggested that a study be conducted to link this trail to the existing trail system in the Kankakee River State Park located in rural Bourbonnais Township.
 
On March 9, 2004 the Kankakee County Board approved a resolution to grant the Kankakee Valley Park District $4,000 from the Kankakee County Quality Improvement Grant Initiative Program to fund a feasibility study for (Phase 1) of the Riverfront Trail project. The Park District also contributed $1,000 of matching funds for this study. Once the feasibility study is completed, an Environmental Assessment Study (EAS) will need to be conducted.
 
A document describing the proposed trail was created by the Kankakee County Regional Planning Department in March of 2004. A copy of this document can be found here: The Riverfront Trail Initiative
 
 
 
 

Kankakee County Planning Department
189 E. Court Street, Room 201  Kankakee, IL  60901
Phone: 815.937.2940   |   Fax: 815.937.2974
Office Hours: Monday - Friday 8:30 am to 4:30 pm
Closed: Saturday, Sunday and Holidays